French |
Aluma Systems
INFRASTRUCTURE SERVICES
CONCRETE FORMWORK AND SHORING
MULTI-MEDIA
Brand Energy and Infrastructure Services delivers high-efficiency concrete forming and shoring solutions to projects ranging from hotels and stadiums to bridges and transit systems. Brand operates under the highly respected name Aluma Systems in the Infrastructure Services market.
With more than 4 decades of infrastructure services experience in more than fifty countries, we have revolutionized on-site productivity (38% improvement) and optimized concrete pour cycles (40% cycle reduction). Our world-class engineering team is continuously developing product enhancements for increased safety, productivity, and customer-specific design requirements. Concrete Construction services include the following:
  • Rental/Sales of Shoring & Formwork Systems
  • Engineering Design, Aluminum and Steel Shoring Solutions
  • Pre-Assembly On & Off Site
  • Temporary Shoring for Existing & New Construction
  • Project Management/Site Technical Direction
  • Safety Programs & Training
  • Custom Aluminum Concrete Forming Systems
Aluma Hi Flyer Video
Aluma Dek Video
Aluma Frame Video
PRODUCTS
CASE STUDIES
Aluma Dek

Aluma Dek

  • Lighter than any comparative product in the industry
  • Highly efficient, costing less per use than comparable deck systems
  • Faster pour cycles
  • Faster assembly
  • Lighter to carry
  • Labor friendly
PDF
Aluma Dek (305KB)
Aluma Truss

Aluma Truss

  • One-time assembly reduces labor costs
  • Compatible with the extensive range of the Aluma Beam®
  • Reduces construction cycle times
  • Modular design simplifies assembly of forms
  • A full range of handling accessories available
PDF
Aluma Truss (324KB)
Aluma Frame Table

Aluma Frame Table

  • Cuts equipment and labor costs up to 50% over steel systems
  • Strength to weight ratio nearly 3x that of steel frames
  • Light enough for one person to carry
  • Single Frame leg functions as a post shore at twice the capacity of a standard steel post
  • Wider frames reduce the number of shoring frames needed
PDF
Aluma Alumacs

Aluma Alumacs

  • Lightweight aluminum construction reduces labor costs
  • Steel braces and screwjacks for increased durability and strength
  • Compatible with the full range of Aluma Beam® and Stringer
  • Modular design increases flexibility and simplicity
PDF
Alumalite Truss

Alumalite Truss

  • Allows the use of extension staffs at the top and bottom of the table forms
  • Can adapt to most slab and beam configurations
  • Compatible with the full range of Aluma Beam® and Stringers
  • Modular design simplifies assembly
  • The most versatile truss system available
  • Reduces construction cycle times
PDF
Aluma Hi-load

Aluma Hi-load

  • Meets the most rigorous job-site requirements
  • Combines strength and durability of steel with light-weight Aluma Beam
  • Widely recognized as the preferred system among contractors as labor friendly
  • Includes a complete range of accessories and frame sizes
  • Allows large mobile tables to be easily assembled
  • Maximum flexibility to meet any job condition
PDF
Aluma Hi-Flyer

Aluma Hi-Flyer

  • A superior column-hung system designed for creating large tables forms
  • Contractors are able to complete floors at a blazing rate of 1 every 3 days
  • Overall production time improves by 25-30%
  • Reshoring can be completely eliminated
  • Engineered by our experienced, safety-award-winning team
  • Provides earlier access to floors below table level for other trades
PDF
Aluma Crane Set

Aluma Crane Set

  • Ideal for water and sewage treatment plants, power plants, bridges, high rises and other jobs
  • Low re-use wood forms bolt easily to versatile Crane Set System
  • High walls go up fast with quickly assembled gangs
  • Lift eyes attach to walers for safe gang movement
  • Works well with self-climbing raisers on high rise projects
  • Addition of special splice plates enables to handle unique one-sided applications
PDF
Aluma Hand Set

Aluma Hand Set

  • 60% faster than job-built plywood forms
  • 30% lighter than comparable modular systems
  • 1,200 psf pour rate; 1, 500 psf for columns
  • Panels bolt directly to Aluma Crane-Set systems
  • Only tool required to erect the forms is a hammer
  • Alignment walers attach with one-piece waler clamp
PDF
Aluma Rollback

Aluma Rollback

  • Requires less handling than conventional wall forms
  • Shorter crane cycles: form can be moved quickly and easily
  • Increased safety: workers are off the form while supported by the crane
  • Increased productivity: greater efficiency on the wide platform
PDF
Aluma Gang Form

Aluma Gang Form

  • Combines the versatility of Aluma Beam with the unequaled strength of the aluminum 55K Strongback
  • Can be used for all wall form configurations while maximizing labor savings
  • Made of lightweight, high strength aluminum
  • Quick and easy assembly
  • Versatile wall form system
PDF
Aluma Beam

Aluma Beam

  • Greater strength to weight ratio than steel or wood
  • Versatile enough for all concrete forming needs
  • Plastic nailer-strip can last four times longer than wood
  • Special aluminum alloy
  • Heavy top flange for increased strength and reduced damage
PDF
Aluma Beam (236KB)
Aluma HD Post Shore

Aluma HD Post Shore

  • High-load capacity of 14,000 lbs. (62 kN) at 8 ft. (2.43m)
  • Reduces the number of post shores by 50%
  • Greater re-shoring spacing allows sub-contractors earlier access to work space
  • L-shaped handle provides easier fine adjustment
  • Optional galvanized tripod makes the erection process faster and easier
PDF
Aluma Frame

Aluma Frame

  • Cuts equipment and labor costs up to 50% over steel systems
  • Strength-to-weight ratio nearly three times that of steel frames
  • Light enough for one person to carry
  • Single Frame Leg functions as a post shore at twice the capacity of a standard steel post
PDF
Aluma Frame (176KB)
these text are invisible
these text are invisible
The Absolute Tower
The Absolute Tower
Mississauga, Ontario
Is it art or architecture that inspires the great
Lester B. Pearson International Airport
Lester B. Pearson International Airport
Toronto, Ontario
Contractor Uses Numerous Formwork Solutions from Aluma
Moss Landing Power Plant
Moss Landing Power Plant
Moss Landing, California
Aluma Supplies Scaffolding and Formwork Services
CityCenter
CityCenter
Las Vegas, Nevada
Hi-Flyer System Helps CityCenter Hit Jackpot
The Aqua Tower
The Aqua Tower
Chicago, IL
Creating a Ripple Effect – The Aluma Hi-Flyer
DOWNLOADS
asd lasd ladjla dladhkad
asd lasd ladjladl adhkad